BoulderMod - Factory Build Day
BoulderMod - Factory Build Day
Wednesday, September 2, 2026 (8:45 AM - 12:00 PM) (MDT)
Description
Join your fellow BOLO Members on September 2nd to help build permanently affordable modular homes! Space is limited so register now!
What You Will Do
Assembly Stations: Work across nine different manufacturing areas inside the climate-controlled factory.
Task Variety: Help with framing, carpentry, electrical work, cabinetry, and final finishes.
Team Environment: Collaborate side-by-side with local high school students from the Boulder Valley School District and expert tradespeople
A few VERY IMPORTANT Details:
- The shift starts at 9:00am; please have everyone plan to be there by 8:45am.
- Please report directly to the factory; there is no need to check in at the district building.
- The address for the factory is 6500 Arapahoe Rd, Building D.
- There is a training room in the facility that will serve as a break room; it has lockers, tables and chairs, and a fridge. There is a bathroom on-site. Any packed lunches can be stored in the break room.
- The factory will be air conditioned if it's still warm outside!
- All required PPE will be provided and we can provide gloves, masks, and hearing protection for those interested.
- Bring a refillable water bottle as those can be taken onto the production floor.
- You must wear long pants and close-toed shoes.
- No previous construction experience is necessary; we will provide tools and training
Images
BoulderMOD Factory
6500 Arapahoe Road, Building D
Boulder, CO United States
6500 Arapahoe Road, Building D
Boulder, CO United States
See map! Do not stop at the administration building, go directly to the Factory at the Southern end of the property.
Wednesday, September 2, 2026 (8:45 AM - 12:00 PM)
(MDT)
Build shift starts at 9:00 a.m. sharp, please arrive by 8:45!
Categories
Fundraising and Outreach
Fundraising and Outreach
Registered Guests
10
10
Powered By GrowthZone